Whangarei
17.89°C
Whangarei
17.89°C
Waitakere City
16.98°C
Manukau City
17.11°C
Papakura
24.46°C
Hauraki
17.26°C
Waikato
17.67°C
Matamata
18.46°C
Hamilton
17.51°C
Otorohanga
18.52°C
Rotorua
16.6°C
Taupo
15.44°C
Tauranga
19.27°C
Kawerau
18.6°C
Whakatane
19.64°C
Gisborne
15.51°C
New Plymouth
16.98°C
Stratford
8.97°C
Ruapehu
14°C
Wanganui
17°C
Palmerston North
16.41°C
Wairoa
19.19°C
Hastings
18.84°C
Napier
18.49°C
Masterton
15.49°C
Carterton
15.66°C
Porirua
15.99°C
Lower Hutt
16.45°C
Wellington
15.79°C
Tasman
9.35°C
Nelson
16.27°C
Marlborough
3.22°C
Kaikoura
15.48°C
Christchurch
12.59°C
Ashburton
12.52°C
Timaru
13.37°C
Waitaki
11.32°C
Waimate
13.08°C
Queenstown
12.38°C
Dunedin
14.33°C
Southland
9.98°C
Gore
11.31°C
Invercargill
12.06°C
Blenheim
14.73°C
Te Anau
27.35°C
Wanaka
11.17°C
Kaikoura
13.38°C
Stratford
13.54°C
Upper Hutt
15.9°C
About
Meridian Energy’s Te Apiti wind farm is located on Saddle Road north of the Manawatu Gorge, 10 kilometres from the city of Palmerston North. It is situated within 1,150 hectares of farmland owned by several landowners, including Meridian Energy.
The wind resource near the Manawatu Gorge is exceptional, even by international standards. The Manawatu gorge acts as a wind funnel, creating consistently high wind speeds.
Te Apiti was the first New Zealand wind farm to supply electricity into the national grid, which is owned by Transpower.
Other wind farms at the time supplied local networks.
The wind farm’s 55 1.65 megawatt Vestas turbines have a total capacity of 90 megawatts. They generate electricity to meet the annual electricity needs of approximately 45,000 average homes.
Each turbine has a tower measuring 70 metres high, and is fitted with 3 blades each 35 metres in length. The blade rotations per minute can vary according to the wind speed but have a maximum speed of 17 revolutions per minute.
The turbines are electronically controlled, with microprocessors that automatically start, stop and monitor them. In very high winds the turbines automatically shut down to avoid damage.
Construction of Te Apiti wind farm started in November 2003. Major work was needed to construct 21 kilometres of roads and excavate the turbine foundations. The roads were built to 10 metres wide to carry the width of the 400-tonne crawler crane that was used to install the turbines. After the turbines were erected the roads were regrassed to 5 metres wide.
Te Apiti began generating electricity in August 2004. Construction of all fifty-five 1.65 megawatt turbines was completed in October 2004 and the site was officially opened by the Prime Minister, Helen Clark, on 9 December 2004.
Meridian was granted tradeable greenhouse gas emissions units (carbon credits) as part of the Ministry for the Environment’s Projects to Reduce Emissions Scheme (PRE) in 2003/2004.
Wind farms are no longer eligible for carbon credits, although some developers have yet to collect the credits they were granted under the PRE. The last round of the PRE was in 2004. Wind farms do not receive a free allocation of carbon credits under the Emissions Trading Scheme.
Wind farms are built today only if they can generate electricity at a cost that is competitive with other forms of generation.
A public viewing area underneath one of Te Apiti’s turbines has views of the wind farm and an information display. The viewing area is open daily from 8.30am to 5pm and is clearly signposted from Saddle Road.